Call us
03
Mobilisation of tools, equipment and personnel
Implementation of Lockout Tagout (LOTO) procedures
Preliminary inspection and documentation of existing conditions
Rotor extraction
Mechanical inspection and air cooling system cleaning
Electrical testing post-cleaning
Tan Delta test and offline Partial Discharge (PD) test
Application of dry air varnish coating (red oxide)
Dismantling
Cleaning and baking
Electromagnetic Core Imperfection Detection (ELCID) test
Reassembly and commissioning



